Fire Protection UK
Fire Collars for Construction
Fire Collars
Fire stopping for plastic pipe penetrations used in construction applications.

Sleev-it pipe collars and pipe wraps are fully tested to BS 476: Part 20;1987 for both 2 hour and 4 hour fire rating for use on the following plastic pipes:

  • uPVC
  • High pressure uPVC
  • Polypropylene
  • Polyethylene
  • ABS

Sleev-it fire collars and pipe wraps can be fitted even when pipes are already in position

Sleev-it fire collars and pipe wraps fully meet building requirements

Tested to BS 476; Part 20; 1987 at Building Research Centre and Warrington Fire Research Centre in United Kingdom

Also tested at C.T.I.C.M in France and Instytut Techniki Budowlanej in Warsaw, Poland